Manufacturing lead-time from Company’s receipt of the “Notice To Proceed” is approximately 6 to 8 weeks for standard structures, and 8 to 12 weeks for custom structures. Delivery is approximately 1 week thereafter. Delivery of structures may be prior to or at the start of assembly. Please note that these timelines do not include approval or permitting timeframes.
Once the item has shipped, you will receive a tracking number and important instructions for unloading. Ship dates are a best estimate and not guaranteed. Shipments can take up to 10 days in transit.
Every order with complex shipping requirements receives shipping instructions. Unless a loading dock is readily available, this equipment ships via curbside delivery.
Cantilever systems generally benefit from having a forklift for unloading, which is typical in the industry.
There are many instances where the crates and pallets can be pulled apart by hand and unloaded as well, but a forklift is generally the quickest way to unload the product and is what trucking companies recommend to avoid possible detention charges (unloading that takes more than 3 hours).
Please see our FAQ for more information.
Choosing a selection results in a full page refresh.